On SZCZ network, the overall situation is coming back to the normal activities. Full operation of Chalupki-Bohumin border point is envisaged on 12 October in the evening, for both passenger and freight trains. All Corridors lines will be fully operational.
ÖBB-I: the situation has improved and gradually returned to normal activities. Since 10 October the Old Western Line has both tracks with max speed 100 Km/h open. Currently there are 3 out of 5 tracks on the East-West Corridor available.
- 85 – 100 % of capacity for freight trains is available on the West Line and on the rerouting line via Herzogenburg possible
- 15 % has to be rerouted via the South Line
- ÖBB-I adapted schedules (with some restrictions for the passanger trains) in order to gain capacity for freight trains
- the New West Line will be temporary repaired by December 14th 2024; a second phase repair will be needed in Summer 2025 for 4 weeks